Shed Site Prep

3 Ways To Make Shed Site Preparation A Royal Pain

Shed Site Preparation–Dumb Edition

Shed site preparation is like getting a new king. It can be a boon for the whole kingdom. Or, it can be a royal pain in your backside. There are three fairly simple ways to make sure that you have a really lousy experience with your shed site preparation.

  1. Choose a poor location for your shed site.
  2. Forget to check with your HOA or city/county offices about setback. Because then, you may get to do site prep twice.
  3. Don’t do your shed company homework. Because then, you may get to do all the heavy work yourself.

[av_image src=’/wp-content/uploads/2016/01/Photo-Apr-22-3-13-00-PM-e1452282270109.jpg’ attachment=’1598′ attachment_size=’full’ align=’center’ styling=” hover=” link=” target=” caption=” font_size=” appearance=” overlay_opacity=’0.4′ overlay_color=’#000000′ overlay_text_color=’#ffffff’ animation=’no-animation’]

Shed Site Preparation–Smart Edition

For a more pleasant experience in your shed site preparation, here are a few suggestions.

  1. Choose your shed site carefully. Try to find a dry site, and one that is free of stumps, rocks, trees, and other interferences. Try to find one that is both even and level, or not more than 2 feet out of level. (To find out whether or not it’s level, use a . . . you guessed it! Use a level. Your eye may not detect how much slope there is.)
  2. Check with your HOA, and city or county offices about proper setback. We saw a case where the HOA came along and told a homeowner that the building had to be moved. The owner had to pay to get the building moved 5 feet. Ouch!
  3. Compare companies. Some shed companies will do most site prep for you under normal circumstances. Others will sell and deliver the building, but everything else is up to you. These are the companies that make these kinds of statements:
    • “Doing any necessary site preparation is solely the customer’s responsibility.”
    • “Site leveling and preparation is the purchaser’s responsibility. cannot be responsible for adverse effects an unlevel pad may have on your new shed.” This basically means, If the doors don’t work, it’s your problem.

So, ask questions. Delivery and set up policies are very different from one shed company to another.

You will often need to do at least a little site prep yourself before delivery–mow the grass, trim a tree, or spray the poison ivy. And sometimes, you may choose to build your own shed foundation. But you may be a great candidate for a simple block set done by your shed delivery guys, saving you a lot of work.

In any case, do your background work, and avoid backside pain.

Related Posts

How To Get Ready For A Shed Delivery — A great little checklist to help you make sure your shed delivery goes smoothly.

Shed Delivery Video — See a shed roll into the backyard, and watch the delivery guys build a block foundation.

7 Tips for a Great Shed Placement

How To Build A Gravel Pad

Shed Foundation 101–The 5 Most Popular Shed Foundations

Be an Ulrich Insider

Be the first to hear about new products and specials by becoming an Ulrich Insider. Plus, stay in the loop with helpful tips and ideas for your lifestyle needs, wants, and dreams.

© 2022 Ulrich Lifestyle Structures LLC. – All Rights Reserved.  |  Privacy Policy

Find Locations

Ulrich is the nationwide manufacturer and retailer of Storage Sheds, Garages, and Cabins. Find an Ulrich Retail Location near you.

Ready to Get Started?

Contact Your Designer

Get Started

Free Design Consultation

Raving Fan

Our Proven Process™ will make you a Raving Fan from Discovery to Installation.

  • Complete a feedback survey to ensure we met your expectations
  • Become an Ulrich Showcase Customer
  • Have your project highlighted on Ulrich TV
  • Submit to win our “Most Improved Lifestyle” award – quarterly
  • Years of memories knowing your invest is back by Ulrich’s best-in-class warranty

Installation

Once your building nears the end of production, your delivery date is confirmed or adjusted for weather complications. Your installation team conveys your delivery window on the day of install. Your building is placed exactly as planned and all accessory items are installed. Final touches and inspections are done to ensure your building is level and ready for you to move in. Once final payment is collected, all keys and documents are left with you, and your “Raving Fan Guarantee” coverage period begins – after which your warranty will start.

  • Confirming your delivery date
  • Onsite Install (or assembly) occurs and final touches (leveling, doors square, ramp installed, etc) and inspection after installation
  • Collect final payment, then hand you the keys & documents
  • Our “Raving Fan Guarantee™” starts and is in place for 2-weeks

The installed solution will be as purchased or a mutually agreed plan will be in place by noon the next business day from install.

  • Your warranty starts after “Raving Fan Guarantee™”

Production

Your design plans are reviewed in detail and then handed off to our production team. Any permits are submitted for review. Pending permit approval, your delivery date is then scheduled and materials are then prepped in our environment controlled facility (safe from the elements).

  • Internal order review and confirmation
  • Project site inspection virtual (or in person as needed)
  • Permits submitted / approved
    • If required, CAD and other engineered docs are drawn and certified at customer’s expense
  • Materials ordered and prepared – change order fees apply at this point
  • Order is checked prior to production completion / onsite build date

Design

Together, we custom design the best solution using our unique process to ensure a Smart Value investment for your lifestyle. 

  • Complete the “Deep Dive Process” to clearly identify all factors and details about the usage, positioning, delivery method, permit requirements, and amenities of your structure
  • Create the blueprint of your perfect structure to precisely fit your property and lifestyle
  • Confirm that this structure is truly your perfect / dream structure and place deposit / sign documents
  • OUR PROMISE: If your structure is permitted and cannot get approved, we will refund you the deposit less any 3rd party fees

Discovery

This is where we sit down and talk about the specifics of your project – including your needs, dreams, wants, and project investment goals as you learn about our proven process and our 3-uniques.

  • Overview of the Ulrich Proven Process to clarify your expectations
  • Project site overview
  • Learn about your needs, dreams, wants, and budget
  • Lifestyle usage and long term goals
  • Identify any known local building codes / HOA restrictions
  • Direct to the perfect team member to design your structure

Discovery

This is where we sit down and talk about the specifics of your project – including your needs, dreams, wants, and project investment goals as you learn about our proven process and our 3-uniques.

  • Overview of the Ulrich Proven Process to clarify your expectations
  • Project site overview
  • Learn about your needs, dreams, wants, and budget
  • Lifestyle usage and long term goals
  • Identify any known local building codes / HOA restrictions
  • Direct to the perfect team member to design your structure

We Can't
Wait To Talk!

Thanks for requesting a qoute! We'll be in touch soon. In the meantime, could you share a bit more about what you're looking for so we can help you better?

Let's Get You A Custom Quote

Configurable sheds start as low as $35,000 in your area, but we'll need a little more information to give you a custom quote.

Let's Start Designing Your Shed!

The next step is to have a no-obligation discovery call with our shed design consultants so we can start customizing your shed design.